View Single Post
Old 02-24-2015, 09:32 PM   #11
spudz
Member
 
Join Date: Apr 2006
Location: SoCal
Posts: 78

The Tackle Pod in the "Prep" stage of the modification. At this point most of the necessary holes had been drilled.



Top view of the Tackle Pod in the "Prep" stage. The holes for the modified wooden cutting board will be drilled next.


spudz is offline   Reply With Quote