Quote:
Originally Posted by Mahigeer
MrPukaShell
Makobob
Mahigeer
Baja_Traveler
Defjack
Sivak
YOU???
|
Just back, 3 days wind, 4 days 0 wind and beautiful. Block work for kitchen should be done this Sunday 5 Feb. I return 9 Feb to frame the kitchen, install the windows and hang the door. Then install lower cabinets and sink. Trying to finish kitchen except painting before March. Tight Lines.
Still time to put YOUR name on this trip. Hope to see you here with us in paradise.