Kayak Fishing Adventures on Big Water’s Edge  

Go Back   Kayak Fishing Adventures on Big Water’s Edge > Kayak Fishing Forum - Message Board > General Kayak Fishing Discussion
Home Forum Online Store Information LJ Webcam Gallery Register FAQ Community Calendar Today's Posts Search

Reply
 
Thread Tools Display Modes
Old 04-26-2015, 03:27 PM   #1
Sdspeed
Senior Member
 
Join Date: Sep 2012
Location: San Diego
Posts: 732
La Jolla Const. Update, Watch Where Ya Park!

Latest email from the City:

The installation of the sewer main and laterals on Calle De La Plata and El Paseo Grande has been completed. During the week of April 27, surface improvements on Avenida De La Playa will begin.

The contractor will start with sidewalk and pedestrian ramp work on the north side of Avenida De La Playa. This will require "No Parking" signs to be temporarily posted in several parking stalls and pedestrians will be detoured around the sidewalk repairs.
When the north side of the work is complete, the contractor will move to the south side of Avenida De La Playa and complete the same work.
Following the sidewalk and pedestrian ramp improvements, paving will begin. Paving will start at La Jolla Shores Drive and Avenida De La Playa and go one block west at a time and will require traffic closure of the area being paved.
The work will cease for the summer construction moratorium after May 22. Work will resume after Labor Day on Camino Del Oro and Vallecitos.
Sdspeed is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -8. The time now is 01:42 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
© 2002 Big Water's Edge. All rights reserved.